background

Case Studies

HSR - III

Vibgyor High, Begur Hobli, Bangalore South Taluk..

Major Challenges Faced:

  1. Site Accessibility Issue - Plot was accessible from one side only
  2. Weak Soil - Soil Was Weak Hence Deep excavation had to be done
  3. Local Community Related issues
  4. Site Management was a challenge due to restricted place for steel yard etc
  5. Frequent Rain Showers were flooding the excavated basement
  6. Shortage of Water created challenges in commissioning the chiller plant

Skills and Technologies Used:

  • Planned Smart Material Movement to avoid Safety issues and delays
  • Did Engineering in depth assessment. analysis around weak soil for timely mitigation of the weak soil issue
  • Did stakeholder engagement and management with local community, did CSR activities for the local area
  • Used Efficient de watering system for flood water management was used
  • Additional borewell has placed with a time bound manner keeping all compliances intact.
  • Embraced Design Innovation, Design Engineering, Project Monitoring & Control.
  • Implemented Project Governance Model Framework
  • Project Central Command centre to track the issues and timely resolution

Results/Outcomes

  • On-time Delivery of the Project
  • Met Zero Accident Goal
  • Delivered within planned Budget
  • Received customer appreciation
  • We also got re-order from the client

Construction Of Eklavya Model Residence School -Telkoi

Eklavya Model Residence School, Telkoi, Kendujhar, Odisha-758084.

Major Challenges Faced:

  1. Agitation by Local Community & Political Parties – Local community created agitation against the project
  2. Material Reachability Issue – Since site is in very remote area, hence transportation is a big challenge.
  3. Labour Compliances Management – Since this is a Labour-intensive work, hence management of compliances for Labour was a major challenge.
  4. Client & Vendor Billing Management – creation of top sheets, measurement sheets, valuation sheets and generation of timely bills for client billing was a major challenge we faced, because lots of coordination among head office and remote site manager was required.

Skills And Technologies Used:

  • Local Community Management – Managed relationship with Gram Panchayat, Villagers for smooth functioning.
  • Client Relationship Management – Developed client relationship with Head Office and Regional Teams for easy communication.
  • BOQ and Estimation Management using RIB CSS CANDY System
  • Usage of CANDY and BuildSmart ERP Modules like Allowable, Cost Performance and Schedule Performance Management
  • Planned Smart Material Movement to avoid Safety issues and delays
  • Embraced Design Innovation, Design Engineering, Project Monitoring & Control.
  • Implemented Project Governance Model Framework for Vendor Performance Management.
  • Project Central Command centre to track the issues and timely resolution both internally and externally.
  • Training and know how around Safety Speak, Safety Practices, Safety Mantra, Safety First

Results/Outcomes

  • On-time Delivery of the Project
  • Met Zero Accident Goal
  • Delivered within planned Budget
  • Received customer appreciation
  • We also got re-order from the client

Black Stone Pitching Work At For Flood Protection Works For Govt Of West Bengal

Howrah, West Bengal

Major Challenges Faced:

  1. 50,000 Cum stone pitching work with red stone (Laterite Stone) along the riverbed for flood protection.
  2. The challenge we got is that this red stone quarry was banned in west Bengal hence the work could not be progressed with red stone.
  3. Our approach, we approached the Govt of west Bengal to change this stone from red stone to black stone, which is readily available in quarry. The major challenge was getting the budget approval for black stone, since in earlier contract red stone budget was approved.
    So, after multiple level of engagement with Govt of West Bengal (Technical, Commercial and Management Team) in conjunction with our client L&T, we succeed in getting the approval for the black stone pitching.
  4. There is another challenge we faced during the execution of the project is Supply chain management (Huge number of trucks plying from quarry to site on daily basis) from quarry to site and labour management for laying the black stone from quarry in bulk quantity.

Project Best Practices Used:

  • Supply Chain Management
  • Local Community Management
  • Labour Management

Results/Outcomes

  • On time Delivery of the Project
  • Met Zero Accident Goal
  • Delivered within planned Budget
  • Received customer appreciation
  • We also got re-order from the client